Flint Engine Operations

Revised:2021-05-03

Print Print   |  Send Email  |  Share Add This  

Location:

2100 Bristol Road
Flint, Michigan. 48552 United States

Year Opened:

Production began in 2002

Facility Size:

1,165,212 sq ft


Employee Information

Hourly:

543

Salaried:

83

Total:

626

Union Local:

UAW Local 659
 
*Population is based on employee count by location and not by full-time equivalent. Data as of March 31, 2021.


Facility Details

Plant Manager: Tamberlin Golden

Investments

  • $263 million (2015) – New engine line at Flint Engine Operations
  • $215 million (2013) – New small Ecotec gasoline engine
  • $7 million (2012) – To build two office buildings to serve both engine units
  • $84 million (2011) – To expand production of 1.4L engines
  • $138.3 million (2010) – To expand production of 1.4L engines
  • $250 million (2009) – To build 1.4L engines

Products & Production

  • Small Gas Engine,  1.5L, 1.5L Turbo, 3.0L Turbo Diesel

Awards

  • 2016 - 1.5L DOHC 4-cyl. Named one of WARDS TEN BEST ENGINES in the world
  • 2008 AND 2009 - 3.6 liter V6 VVT with SIDI named one of WARDS TEN BEST ENGINES in the world
  • First GM Powertrain plant to go “Landfill Free.”   Zero plant waste sent to landfills since March, 2005

GM State Economic Impact

  • 2020 State Wages: $55,003,635.67 
  • 2020 Total Tax Withheld: $10,129,962.51 

*Wages include hourly and salaried combined
*Total tax withheld does not include EE, SS or MED

Back to top